Landscape Construction

• Industrial
• Commercial
• Estate
• Housing Projects

• Shopping Centers
• Revegetation Projects
• Private Work
• Public Works

• Planting
• Irrigation Work
• Xeroscape
• LEED Projects

Landscape Construction Services

Plowboy Landscapes Inc. has 60-80 employees who construct landscapes from West Los Angeles to San Luis Obispo.

We have a construction superintendent and foremen who have worked for us for 25 years. We love to expand and welcome work from any industry sector.

So, that means Plowboy builds landscapes for commercial projects, industrial projects, estate work, residential projects, revegetation projects, government and public works jobs, hotels, retirement homes, shopping centers, and specialty jobs. We also provide budget bids for landscape architects and contractors.

After all this time, we have a good idea of how to do the work and be competitive. We require designs by landscape architects for all our jobs. If you don’t have one, we’ll get one for you. We welcome the opportunity to budget your project and get in on the ground floor of the development.

Please read our references and awards and look at our pricing guide. This is a hands-on business. When you choose us, you get me, Doug Wasson, owner and founder of Plowboy Landscapes Inc. I’m pretty good at evaluating projects, estimating costs, and resolving the problems which always occur, and I like plants.

previous arrow
next arrow

Landscape Construction Pricing

PLANTING:
1 GALLON $ 20.00
5 GALLON $ 50.00
15 GALLON $ 150.00
24″ BOX TREE $ 500.00
36″ BOX TREE $ 1,400.00
48″ BOX TREE $2,700.00
60″ BOX TREE $5,000-6,000.00
72″ BOX TREE $9,000.00-11,000.00
LARGER BOX TREES MATERIAL COST X 2
FLATS – GROUND COVER $ 60.00
TURF – SOD $2.00 PER S.F.
ROOT BARRIERS $15.00 PER LINEAR FT.
HEADER-TREX ONLY $15.00 PER LINEAR FT.
HYDRO-SEED $0.30 PER S.F.
SOIL AMENDMENTS & MULCH $140.00 PER C.Y.
GRADING – FINISH $0.20 PER S.F.
MAINTENANCE – ESTABLISHMENT PERIOD (PER MONTH) $0.20 PER S.F.
IRRIGATION:
TURF & SHRUB HEADS & BUBBLERS $ 50.00
TURF & SHRUB HEADS – 12″ HI-POPS $ 60.00
TURF & SHRUB ROTORS-25′ RADIUS $ 110.00
TREE ROOT WATERER $ 100.00
REMOTE CONTROL VALVES $ 650.00
ISOLATION VALVES $ 200.00
HOSE BIBS $ 300.00
QUICK COUPLERS $ 200.00
P.V.C. (CL 200) LATERAL LINE $4.00 PER FT.
P.V.C. (SCH. 40 & 315) 2″ MAIN LINE $11.00 PER FT.
CONTROLLERS (24 Stations) $3,500.00
REDUCED PRESSURE BACKFLOW – 2″ $3,500.00
DRIP LINE ( WITH EMITTERS) $2.50 PER FT.
CONTROLLER WIRE $ .25 PER FT.
SLEEVES $10.00 PER FT.
MASTER VALVE $1,200.00
FLOW SENSOR $1,500.00
PRESSURE REGULATOR $900.00
SUB METER $1,500.00

1. TO USE THESE UNIT PRICES, A GENERAL PLANT COUNT & SQUARE FOOTAGE MUST BE OBTAINED, ALONG WITH AN IRRIGATION COUNT.
2. BE SURE TO ADD 10% TO YOUR BID AFTER YOU HAVE COMPUTED ALL ITEMS IF YOU WANT TO BE CAREFUL.
3. PRICES INCLUDE: LABOR, MATERIALS & INSTALLATION.
4. CALL PLOWBOY FOR PALM PRICES.
5. THESE ARE NON UNION PRICES.
6. THESE PRICES ARE BASED ON TYPICAL COMMERCIAL QUALITY DESIGN & MATERIALS ON A 2” IRRIGATION MAIN LINE SYSTEM.
7. FOR PREVAILING WAGE PUBLIC WORKS: MULTIPLY UNITS BY 140% (STATE) & 150% (FEDERAL).
8. FOR RECLAIMED WATER SYSTEMS ADD 10%.
9. COST FOR CRANE, IF NEEDED, NOT INCLUDED FOR LARGE TREES, 48” AND ABOVE.

UPDATED APRIL, 2022

Landscape Construction Contract

For your convenience, please click to download Plowboy’s
Landscape Construction Contract.

LEARN MORE ABOUT PLOWBOY LANDSCAPES

Translate »